Call Pharmacy Direct 0121 772 3873

 

 Call Pharmacy Direct 0121 772 3873 

 
Pharmacy Direct GB
 
 
20f8f109b28ba38029e8cea9052a8216-1.jpg
1.jpg
 

Mobile

Tablet

COVID-19 - Our pharmacy is operating as normal with only minor stock issues that are up-to-date against each medicine read more.

    UK Registered Pharmacy Since 1964

    Online Prescriptions Available

    Free Delivery on orders over £40

 
 

In addition to Horizontal Directional Drilling ('HDD'), Pipe Bursting or Open Cut methodologies, K M Plant can apply Live Insertion techniques to Mains Services Renewal for existing Gas Mains, Pipelines and Network Operator Infrastructure, thusly minimising the potential disturbance to surface level infrastructure, through this minimally invasive technique, and thereby minimising the disruption and inconvenience to the general public., and provide potential 'Never Off' supply continuance, during the works.  

K M Plant can provide Pipe Bursting insertion techniques, for Mains Services Renewal, Rehabilitation and Refurbishment for Potable Water Mains, Mains Sewers and any associated Pipeline Network Infrastructure.